2016年12月26日星期一

How to Pile up Spiral Welded Steel Pipe?

Spiral welded steel pipe manufacturer produces spiral steel pipe are generally mass production, and the specifications of the various production, the production of spiral steel tube how to pile up? Correct stacked spiral steel pipe is conducive to protect the quality of the spiral steel pipe, prolong the life of the spiral steel pipe, prevent deformation, erosion, do well organized stacked spiral steel pipe, but also to the loading of late spiral steel pipe, inventory. Spiral steel pipe buyers should also be stacked spiral steel pipe according to request.
Below small make up to you to introduce spiral steel pipe right stacking principle.
1) spiral steel pipe, deposited in the open air under the required by wood or stone, crib shall be slightly tilted, and to facilitate drainage, and pay attention to material placed flat, prevent caused by bending deformation.
2) the principle of spiral steel pipe stacking requirements is in the pallet, ensure safe premise, do according to the varieties, specifications of pallet, different kinds of materials to pallet respectively, prevent muddied and mutual erosion, also facilitate outbound loading.
3) ban on spiral steel pipe pile a deposit of steel erosion things around.
4) spiral steel pipe pile bottom should be higher, solid, smooth, prevent the material to be affected with damp be affected with damp or deformation,
5) the same material in warehouse stacking respectively.
6) structural steel pipe stacking height, artificial homework no more than 1.2 m, the mechanical work no more than 1.5 m, crib for no more than 2.5 m wide,
7) between pile and pile should have certain channels, check way for o. commonly 5 m, access depending on the material size and transport machinery, general is 1.5 ~ 2. Om,
8) Angle steel and channel steel should be deposited in the open air, over the mouth down, beams should be made to put, steel tank I face up, not to avoid water accumulation of rust.
9) pile bottom cushion is high, if the warehouse to the cement ground, higher o. 1 m, if the mud, to cushion high o. 2 ~ 0.5 m. If the open area, cement floor mat high o. 3 ~ 5 m o., sand and mud surface mat high 0.5 ~ o. 7 m.
Above is the right spiral carbon steel pipe pile up principle, to ensure the quality of the spiral steel pipe, must according to the principle of piles.

没有评论:

发表评论